System integration
Foam delivery, rim seal and dam geometry are reviewed as one system.
Foam dams and rim fire-system interfaces
Project-engineered foam-dam and rim-interface components that coordinate the floating roof, seal geometry and the fire-protection philosophy instead of treating the foam dam as a stand-alone strip of metal.
Height, material, support and position are governed by the roof and seal geometry as well as the selected fire-protection concept. The same physical detail is not appropriate for every internal, covered or external floating roof.
EZfoam is therefore supplied as project-engineered scope with the final material and geometry coordinated with the applicable fire-system design and code requirements.
Foam delivery, rim seal and dam geometry are reviewed as one system.
Material is selected from the actual fire-protection and project code basis.
Plate height, supports and local leg sections are detailed for the roof configuration.
The arrangement should not create unnecessary obstacles to seal inspection and maintenance.
Fire-protection design remains the responsibility of the project fire-system basis. EZfoam geometry and materials are coordinated with applicable requirements such as NFPA 11 where relevant.
Emission Zero can review the application before turning it into a product configuration or project specification.